Civil Engineering June 2022 | Vol 30 No 5
Civil Engineering June 2022 33 system (which can be de-activated if de- sired) prevents settling out by immediately draining the entire contents of the rising main back to the river. The automated system also allows for re-filling the rising main at a controlled rate to avoid damaging the pumps due to insufficient backpressure. Although not necessary for operational reasons, variable frequency drives are necessary to limit the start-up currents (the Eskom supply comes all the way from Craigieburn and has certain limitations). NGWADINI DAM CHOICE OF DESIGN As there is very limited material with a high enough clay content to construct a conventional earthfill embankment dam, the Ngwadini Dam has been designed as a concrete face rockfill dam (CFRD). As the Ngwadini catchment is very small, the design flood can easily be accommodated by a side channel ogee crest spillway with a trapezoidal concrete spillway chute, flip bucket and plunge pool. The intake tower (which incorporates multi-level offtakes and three outlet sleeve valves) is accessed via a bridge which can be used by con- struction/maintenance vehicles. Table 1 indicates the Ngwadini Dam and appurtenant structures’ characteristics. NGWADINI DAM GEOLOGICAL AND GEOTECHNICAL ASPECTS Dam site and quarry / borrow pit inves- tigations from a number of studies since 1996 included rotary core drilling, test Figure 9 Ngwadini Dam design overview Table 1 Ngwadini Dam characteristics Component Value Catchment area 1710 ha Mean annual precipitation 910 mm Mean annual evaporation 1 050 mm Dam category III Dam capacity Total storage volume 10.6 million m 3 Dam embankment Type CFRD Height 52 m Crest length 300 m Crest width 8 m Upstream slope 1V:1.4H Downstream slope 1V:1.6H Fill volume 625 000 m 3 Face slab area 12 000 m 2 Spillway Side channel spillway, chute with downstream flip bucket Recommended design flood peak (1:200) 430 m 3 /s Safety evaluation flood peak (RMF+) 714 m 3 /s Probable maximum flood peak 810 m 3 /s Spillway ogee crest length 40 m Chute width 10 m River diversion 1:20 year flood 160 m 3 /s Outlet conduit diameter 4.5 m Outlet conduit length 230 m Outlet works Type and size of intake tower 8 m x 11 m rectangular 49.3 m high concrete tower Intake offtakes 5 x 1000 mm diameter staggered levels Pipe system Dual vertical stacks Pipe diameter 800 mm Pipe length and discharge 54 m 1.7 m 3 /s Downstream control 3 x sleeve valves (2 x 500 NB, 1 x 200 NB) Emergency draw down FSL to MOL in 46 days Side channel spillway CFRD dam wall Intake tower Diversion tunnel Outlet works Flip bucket Chute Spillway bridge
Made with FlippingBook
RkJQdWJsaXNoZXIy MzE5NDI=